Working under drilling unit, Jt20 operator’s manual – Ditch Witch JT20 User Manual
Page 158
![background image](/manuals/735351/158/background.png)
JT20 Operator’s Manual
Service - 157
Service Precautions
CMW
®
Working Under Drilling Unit
Before working under area of drilling unit supported by a stabilizer, make sure drilling unit is parked on
hard surface.
1.
Remove cylinder locks from storage at rear of pipe box and place over extended cylinder rods (shown)
with curved ends toward stabilizer shoes.
2.
Raise stabilizers to lower unit until load is supported by cylinder locks.
If working under raised drill frame, support front and back of drill frame with jack stands or equivalent
brace capable of supporting the weight of the unit.
Crushing weight could cause death or serious injury. Use
proper procedures and equipment or stay away.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)