Prepare jobsite, Mark bore path, Prepare entry point – Ditch Witch JT20 User Manual
Page 72: Jt20 operator’s manual
JT20 Operator’s Manual
Prepare - 71
Prepare Jobsite
CMW
®
Prepare Jobsite
Mark Bore Path
Mark your planned bore path and all located utility lines with flags or paint.
Prepare Entry Point
For bore to be successful, first pipe must be straight as
it enters the ground.
To help ensure that the first pipe does not bend, dig a
small starting hole so that the first pipe is drilled into a
vertical surface.
To prevent bending or straining pipe, position drilling
unit for straight entry.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
To help avoid injury,
•
If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.
•
Expose lines by hand before digging. Cutting high voltage cable can cause electrocution.
•
Remove all vegetation near operator’s station. Contact with trees, shrubs, or weeds during electrical
strike could result in electrocution.