beautypg.com

Dillon Precision SL 900 User Manual

Page 40

background image

13. Now that you have determined the powder

charge, move to Station 3 for wad and shot insertion.

14. Get a supply of wads.
15. Use the same hull with powder in it. At Station

three, insert the wad into the wad swing arm and

move the roller handle down. Fig. 16

16. Return the roller handle to its rest position and

remove the hull from the shellplate by pressing down

on the locator button. Pour the shot back into the shot

hopper.

17. Repeat these steps 4 times to make sure you

are receiving a uniform shot charge.

18. Weigh the fifth shot charge. Adjust as needed

to the desired weight.

At Stations 4 and 5, the starter crimp die and final

seat/crimp functions are performed.

19. Using the same hull with shot in it in Station

4, move the roller handle down and then back to its

rest position, the formed and folded hull has just

completed Station 4 and has advanced to Station 5.

Fig. 17

20. Once again, move the roller handle down. As

you return the roller handle to its rest position, you'll

see the completed round advance and move out of

the machine.

21. Inspect the completed round.
22. Before you begin reloading, review all

assemblies to assure yourself that all the screws you

touched are tight. You are now ready to begin your

reloading session.

Once you’ve started loading, Fig. 18 shows a full

shellplate with all functions performed.

Fig. 18

Fig. 17

Fig. 16

40

SL 900, May 2007 5/21/07 11:51 AM Page 40