Tools for installation – Conair 100 User Manual
Page 119
![background image](/manuals/70770/119/background.png)
I n s t a l l i n g t h e M D C
The MDC was designed to be mobile. So every time you move the MDC, you will
need to mount the vacuum receiver, connect the main power source, and connect a
water source for the optional aftercooler. Phasing of electric power should be
consistant between locations.
The first time you install the MDC:
1
1
Move the MDC to the processing area. Lock the wheels on the drying cart.
2
2
Mount the vacuum receiver on the feed throat. Push the vacuum receiver
onto the mounting bracket.
3
Connect the conveying lines.
4
Connect the RTD probe.
5
Connect the demand sensor to the electrical enclosure of the dryer.
6
Connect the main power source.
7
Connect a source of water for the optional aftercooler.
Conveying lines
Demand
sensor
Vacuum receiver
Tools for
installation:
❒ Phillips screwdriver
❒ Flathead screwdriver
Central
When configured as
a central dryer, the
MDC option is not
available.