beautypg.com

Master-satellite operations, Programming operations, Chapter – Toshiba TEC FDS-50 User Manual

Page 103

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

EOl-11005

6. MASTER-SATELLITE OPERATIONS

The FDS-50 system can be extended to compose a Master Terminal and a maximum of three

Satellite Terminals, in a Master-Satellite System, sale entry operations are the same on any

terminal as described in this Owner's Manual. In addition, in-line service operations are provided on
the Master Terminal. The following is an overview of in-line service operations:

In-line X and Z Reports started by report commands on the Master Terminal.

DLLs {Down Line Loadings) to add or change program data of all the terminals by DLL

commands on the Master Terminal.

Since not every user adopts a Master-Satellite System, information on these operations are to be
offered by your TEC representative.

7. PROGRAMMING OPERATIONS

The system should be programmed fully according to the user’s requirements at the time of delivery
so that daily operations can immediately start. However, some data must be added or changed daily
or in a longer period. Please consult with your TEC representative about what programmings are

needed as user’s daily jobs and what programmings are to be contained as your TEC representative

service. Since the volume of programming contents for the system is large, the TEC representative
is entirely responsible of service and information on programming operations.

-21 -