Required equipment, Unpacking and inspecting the switch – Cisco 5000 Series User Manual
Page 68

S e n d c o m m e n t s t o n 5 k d o c s @ c i s c o . c o m
3-4
Cisco Nexus 5000 Series Hardware Installation Guide
OL-15902-01
Chapter 3 Installing the Cisco Nexus 5500 Platform or 5000 Series Switch
Preparing for Installation
Caution
To prevent loss of input power, ensure the total maximum loads on the circuits supplying
power to the switch are within the current ratings for the wiring and breakers.
•
Use the following screw torques when installing the switch:
–
Captive screws: 4 in-lb
–
M3 screws: 4 in-lb
–
M4 screws: 12 in-lb
–
10-32 screws: 20 in-lb
–
12-24 screws: 30 in-lb
Required Equipment
Before beginning the installation, ensure that the following items are ready:
•
Number 1 and number 2 Phillips screwdrivers with torque capability
•
3/16-inch flat-blade screwdriver
•
Tape measure and level
•
ESD wrist strap or other grounding device
•
Antistatic mat or antistatic foam
The following additional items (not found in the accessory kit) are required to ground the chassis:
•
Grounding cable (6 AWG recommended), sized according to local and national installation
requirements; the required length depends on the proximity of the Cisco Nexus 5548P switch or the
Cisco Nexus 5000 Series switch to proper grounding facilities
•
Crimping tool large enough to accommodate girth of lug
•
Wire-stripping tool
Unpacking and Inspecting the Switch
Caution
When handling switch components, wear an ESD strap and handle modules by the carrier edges only.
An ESD socket is provided on the chassis. For the ESD socket to be effective, the chassis must be
grounded through the power cable, the chassis ground, or the metal-to-metal contact with a grounded
rack.
Tip
Keep the shipping container in case the chassis requires shipping in the future.
Note
The switch is thoroughly inspected before shipment. If any damage occurred during transportation or
any items are missing, contact your customer service representative immediately.