beautypg.com

AERCO BMK 1000 User Manual

Page 54

background image

Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

CHAPTER 3 – OPERATION

Page 54 of 192

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0082_0J

05/21/2014

Ph.: 800-526-0288

GF-130

Table 3-9: Relationship Between Air/Fuel Valve Position and Energy Input

For 750 MBH & 1000 MBH Units Running On PROPANE

Air/Fuel Valve

Position (% Open)

Energy Input

(BTU/Hr)









Boiler Energy Input
(% of Full Capacity)









750 MBH

1000 MBH

750 MBH

1000 MBH

0%

0

0

0

0

10%

0

0

0

0

18% (Stop Level)

50,000

50,000

6.7%

5.0%

20%

71,000

71,000

9.5%

7.1%

30%

128,000

181,000

17%

18%

40%

373,000

400,000

50%

40%

50%

508,000

562,000

68%

56%

60%

565,000

703,000

75%

70%

70%

621,000

791,000

83%

79%

80%

660,000

865,000

88%

87%

90%

723,000

963,000

96%

96%

100%

750,000

1,000,000

100%

100%



This manual is related to the following products: