beautypg.com

AERCO BMK 1000 User Manual

Page 35

background image

Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

CHAPTER 2 – INSTALLATION

OMM-0082_0J

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 35 of 192

GF-130

Ph.: 800-526-0288

05/21/2014

the isolation valve opens for a programmed interval (default = 1 minute) before closing. When
the system load is satisfied, the BST system will open the isolation valves for all of the boilers.

The implementation of BST, and the installation and use of this valve is optional.

The boiler is pre-wired to accept the sequencing isolation valve. Installation consists of installing
the sequencing isolation valve in the hot water outlet pipe, and then connecting it into the shell
harness, as described below.

NOTE

When the Sequencing Isolation Valve is used, the AUX START ON DLY in
the Configuration menu must be set to at least 120 seconds. The
Sequencing Isolation Valve control is only available when BST is enabled.
Refer to section 2.10.12.2 and Table 3-4 in section 3-6 and Chapter 10.

Installing Sequencing Isolation Valve

1.

Install the sequencing isolation valve in the boiler’s hot water outlet pipe.

Figure 2-13: Sequencing Isolation Valve Installed

HOT WATER

OUTLET

SEQUENCING

ISOLATION VALVE

This manual is related to the following products: