1 configuring jumpers on the server board, Installing the power supply module, Grounding a dc-powered system – Kontron NSC2U IP Network Server User Manual
Page 32: Configuring jumpers on the server board, Figure 16

NSC2U Server—Server Component Installations and Upgrades
Kontron IP Network Server NSC2U
Product Guide, rev. 1.4
December 2009
32
3.3.2.2
Installing the Power Supply Module
1. Press and hold the green safety lock downward and slide the power supply module
into the chassis slot.
3.3.2.3
Grounding a DC-Powered System
The DC chassis provides two #10-32 threaded studs for chassis enclosure grounding. A
single 90º standard barrel, two-hole, compression terminal lug with 5/8-inch pitch
suitable for a #14-10 AWG conductor (such as the Thomas & Betts* terminal lug, p/n
256-31426-141) must be used for proper safety grounding. See “C” in
for the
location of the ground studs.
A crimping tool may be needed to secure the terminal lug to the grounding cable.
3.4
Internal System Component Configuration and Installation
Procedures
Note:
The procedures in this section assume that you have powered down the server and
removed the chassis cover as described in
3.4.1
Configuring Jumpers on the Server Board
The jumpers are located on the T5000PAL server board, which is in the rear right
section of the IP Network Server NSC2U chassis. To configure the jumpers on the
server board, you must first remove the chassis cover and then the processor air duct
Figure 16.
AC and DC Power Supplies
AC PS
DC PS
A
B
B
C
D
TS000276