Edge Lighting Reveal, 24VDC Plaster-In LED System User Manual
Page 3

3
16: OPTIONAL: Insert the joining rods half way into the
each channel circular ends sliding them towards each
other.
I
17: Install the dead end cap to the end of the channel
opposite the junction box.
J
CHANNEL 1
CHANNEL 2
JOINING ROD
NOTE:
Channel may be cut in the field. For installation over
120" join two or more Reveal channels together shown on
diagram B
NOTE:
It is recommended more than one person to install
the Reveal channel.
16
16
POWER FEED
END CAP
REVEAL
CHANNEL
DEAD END CAP
SCREW
17
17
K
21: Align the power feed end cap into the junction box
opening slot and push channel into the drywall cutout.
22: Make sure channel is aligned straight using a laser
level.
23: Insert the power feed end cap into the junction box slot
and align the channel to the drywall cutout. First secure
the channel using the two Phillips screws to the junction
box (same screws as in step 5 page 1) followed by
fastening the drywall screws through the pre-drilled
holes onto the studs.
If necessary drill new holes on channel flange where
they line up with the studs using the #6 X 1-5/8"
square trim screw with the square recess bit
provided.
L
JUNCTION BOX
CONDUIT
21
19
18: Connect the red power supply (24VDC+) wires to each
red power wire with a wire nut inside the electrical
box.
19: Connect the black power supply (24VDC-) wires to each
black power wire with a wire nut inside the electrical box.
20: Place the wire nut connections inside junction box.
NOTE:
Make sure screw head is flush with the channel
flange.
POWER FEED
END CAP
PHILLIPS
SCREW
WOOD
SCREW
JUNCTION
BOX SLOT
CHANNEL
FLANGE
23
18
20