beautypg.com

Great Plains YP625PD Operator Manual User Manual

Page 3

background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

02/23/2011

Cover

Index

401-754M

©

Copyright 2006, 2007, 2008, 2009, 2010, 2011 All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Printed in the United States of America

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................6
Introduction ................................................................11
Models Covered ...........................................................11
Description of Unit ........................................................11

Intended Usage ........................................................11
Document Family......................................................11

Using This Manual........................................................11

Definitions.................................................................11

Owner Assistance ........................................................12
Preparation and Setup ...............................................13
Initial Setup...................................................................13
Post-Delivery/Seasonal Setup......................................13
Pre-Planting Setup .......................................................13
Hitching Tractor to Planter............................................14

Electrical Hookup......................................................14
Hydraulic Hose Hookup............................................15

Leveling Planter............................................................16

Wheel Adjustment for Leveling.................................16

Monitor Setup ...............................................................17
Marker Setup (Option)..................................................17
Operating Instructions...............................................18
Pre-Start Checklist .......................................................18
Raising/Lowering Planter .............................................19

Re-Phasing Lift System ............................................19
Lift Cylinder Locks ....................................................19

Transport ......................................................................20

Typical YP625PD Planter Weights ...........................20
Transport Steps ........................................................21

Loading Materials .........................................................22

Hopper Operations ...................................................22
Loading Seed ...........................................................22
Loading Dry Fertilizer ...............................................24

Suitable Materials .................................................24
System Inspection ................................................24
Hopper Lid Operation ...........................................24

Dry Fertilizer Operation ................................................25
Monitor Operation.........................................................26
Air System Operation ...................................................27

Air and Seeding System Overview ...........................28

Fan Circuit Operation ...........................................29
Fan General Operating Information......................30
Butterfly Valve Operation:.....................................30

Air-Pro

®

Meter Operation .............................................31

Meter Operation .......................................................31

Marker Operation (Option) ........................................... 32

Before Operating Markers........................................ 32
Marker Unfold (one side).......................................... 32

Both Sides Unfolded ............................................ 32

Row Marker Operation ............................................. 32
Folding The Markers ................................................ 32

Field Set-Up Checklists................................................ 33
Field Operation ............................................................ 35
Short-Term Parking...................................................... 36
Long-Term Storage ...................................................... 36
Adjustments ............................................................... 37
Setting Material Rates.................................................. 38

Planting Rate Details................................................ 38

1. Rate: Monitor configuration: ............................. 38
2. Rate: Disk Selection: ........................................ 38
3. Rate: Range Sprockets .................................... 39
4. Rate: Transmission Sprockets ......................... 39
5. Rate: Seed Inlet Shutter ................................... 40
6. Rate: Meter Pressurization............................... 40
7. Rate: Checking................................................. 40

Fan and Adjustment ..................................................... 41

Furrow Check: ...................................................... 41

Fine-Tuning Meter Pressurization ............................ 42

Alternate Skip/Double Check ............................... 42

Dry Fertilizer Adjustment.............................................. 43

Dry Fertilizer Rate .................................................... 43

Frame-Mounted Accessory Adjustments ..................... 43

Coulter Adjustments (Option)................................... 43

Coulter Depth ....................................................... 44
Coulter Blade Angle ............................................. 44
Coulter to Row Alignment .................................... 44
Coulter Blade Style .............................................. 44

Fertilizer Applicator Adjustments (Option)................ 45

Applicator Release Height.................................... 45
Applicator Release Angle ..................................... 45

Dual Terra-Tine™ Adjustment (Option) ................... 46

Terra-Tine™ Down Force .................................... 46
Terra-Tine™ Height ............................................. 46
Terra-Tine™ Row Alignment................................ 46

Marker Adjustments (Option) ....................................... 47

Marker Disk Adjustment ........................................... 47

Gauge Wheel Height Adjustment................................. 47
25AP Series Row Unit Adjustments............................. 48

Row Unit Down Pressure ......................................... 49

Adjusting Down-Force .......................................... 49

Row-Unit Opener Disk Adjustments......................... 51

Setting Planting Depth ......................................... 51