Appendix b - initial setup, Post-delivery checklist, Seed monitor console installation – Great Plains YP625PD Operator Manual User Manual
Page 112

401-754M
02/23/2011
108
YP625PD
Great Plains Manufacturing, Inc.
Appendix B - Initial Setup
This Appendix covers setup tasks performed only once,
or at infrequent intervals. Routine setup tasks are
covered in “Preparation and Setup” on page 13.
Perform Appendix B tasks first. Some of these items may
already have been done by your Great Plains dealer:
a.
Seed monitor console installation (below)
b.
Frame-mounted row options
(see manual supplied with accessory)
c.
Marker setup (Option, page 111)
d.
Seed Monitor Console Installation
Refer to Figure 98
The planter’s standard PM400 seed monitor system
includes a console
that needs to be mounted in the
cab of the tractor to be used with the planter.
Transport and Field Safety Risk:
Mount the module so it is easy to monitor during planting, but
does not interfere with safe operation of the tractor in the field
or on public roads.
The monitor includes cables for power
, speed
sensor
and sensor harnesses
. Installation
instructions are found in the included DICKEY-john
®
manual.
Power required is 12Vdc. Power color code is:
+ positive: red
- negative: black
The included bracket
requires customer-supplied
fasteners.
Post-Delivery Checklist
1.
Read and understand “Important Safety
Information” on page 1.
2.
Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
3.
Check that all grease fittings are in place and
lubricated. See “Lubrication” on page 86.
4.
Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “Safety Decals” on page 6.
5.
Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Tire Inflation Chart”
on page 97.
ll
Figure 98
PM400 Tractor Components
32005
1
3
4
2
5
1
2
3
4
5