The control’s exterior can be cleaned using a damp cloth. Moisten the cloth with water and wring out prior to wiping the control. Do
not use solvents or cleaning solutions.

Cleaning The Control

Dip Switch Settings

GENERAL

The DIP switch settings on the control are very important and should be set
to the appropriate settings prior to making any adjustments to the control
through the User Interface. The DIP switch settings change the items that
are available to be viewed and / or adjusted in the User Interface.

If a DIP switch is changed while the control is powered up, the control responds
to the change in setting by returning the display to the VIEW menu.

Advanced / Installer

The

Advanced / Installer DIP switch selects the access level of the

control. In the

Installer access level, a limited number of items may be

viewed and / or adjusted. In the

Advanced access level, all items may

be viewed and / or adjusted.

Setback / Off

The

Setback / Off DIP switch selects whether or not the internal

setback timer and schedule is to be used. If the switch is set to
Setback, the timer must be set and the setback schedule must be
entered to provide setback events.

15

16

13

17

Mix1

P2

Power

N

L

Prim

P1

Mix2

P3

14

DIP Switches

Universal Reset Control 374

Boiler Demand
Mix 1 Demand
Mix 2 Demand
DHW Demand
Setpoint Demand

Test

off

not testing

red

testing

red

testing paused

For maximum
heat, press &
hold Test for 3
seconds

Made in Canada by

tekmar Control Systems Ltd.

Power:

115 V ±10% 50/60 Hz 1700 VA

Relays:

230 V (ac) 5 A 1/3 hp, pilot duty 240 VA

Variable Pump: 230 V (ac) 2.4 A 1/6 hp, fuse T2.5 A

Demands:

20 to 260 V (ac) 2 VA

Boiler Sensor

Variable

Off

Supply

Installer

Advanced

Setback

30% Enable

10% Enable

Return

Rotation

Floating

Menu

Item

eset Control 374

seconds

Made in Canada by

tekmar Control Systems Ltd.

y

Power:

115 V ±10% 50/60 Hz 1700 VA

Relays:

230 V (ac) 5 A 1/3 hp, pilot duty 240 VA

Variable Pump: 230 V (ac) 2.4 A 1/6 hp, fuse T2.5 A

Demands: 20

to

260

V

(ac) 2 VA

u

Item

Universa

Boiler Demand
Mix 1 Demand
Mix 2 Demand
DHW Demand
Setpoint Demand

off

not testing

red

testing

red

testing pausedd

For maximum
heat, press &

M

10% Enable

Boiler Sensor

Variable

Off

Supply

Installer

Advanced

Setback

Return

Rotate

Floating

30% Enable

30% Enable

10% Enable

Boiler Sensor

Variable

Off

Supply

Installer

Advanced

Setback

Return

Floating

Rotate

Mix 2

If a floating action actuating motor circuit is connected to the

Pwr Mix, Opn and Cls Var2 terminals (3, 4 and 5), make sure

power to the motor circuit is off and install a jumper between the

Pwr Mix and Opn terminals (3 and 4). When the circuit is

powered up, the actuator should move in the opening direction. If it does not, check the wiring between the terminals and
the actuating motor. Refer to any installation or troubleshooting information supplied with the motor. If the motor closes
instead of opening, the wiring of the actuating motor must be reversed. If the valve opens correctly, turn off the power to
the circuit and remove the jumper. Install a jumper between the

Pwr Mix and Cls Var2 terminals (3 and 5). When the circuit

is powered up, the actuator should move in the closing direction. If it does not, check the wiring between the terminals and
the actuating motor. Refer to any installation or troubleshooting information supplied with the motor. If the motor closes
correctly, turn off the power to the circuit and remove the jumper.

Connecting the Control

Make sure all power to the devices and terminal blocks is off, and remove any remaining
jumpers from the terminals.

Reconnect the terminal blocks to the control by carefully aligning them with their
respective headers on the control, and then pushing the terminal blocks into the headers.
The terminal blocks should snap firmly into place.

Install the supplied safety dividers between the unpowered sensor inputs and the
powered or 115 V (ac) wiring chambers.

Apply power to the control. The operation of the control on power up is described in the
Sequence of Operation section of the brochure.