beautypg.com

2 servicing the spm, 1 regenerating the spm, Servicing the spm – Metrohm 940 Professional IC Vario ONE/SeS/PP/Prep 3 User Manual

Page 111

background image

■■■■■■■■■■■■■■■■■■■■■■

5 Operation and maintenance

940 Professional IC Vario ONE/SeS/PP/Prep 3 (2.940.1530)

■■■■■■■■

101

The SPM consists of three neutralization units, which are used in rotation,
regenerated with perchloric acid, and rinsed with ultrapure water. In order
to record every new chromatogram under comparable conditions, you
should normally work with a freshly regenerated SPM.

CAUTION

The SPM must never be switched over if liquid is not flowing through it,
since otherwise it may become jammed. If the SPM is in a dry state, it
must be rinsed for at least five minutes before it may be switched over.

CAUTION

The SPM has to be regenerated (see Chapter 5.17.2.1, page 101),
cleaned (see Chapter 5.17.2.2, page 102) or replaced (see Chapter
5.17.2.3, page 102)
if the capacity of the SPM is reduced or if the
backpressure is high.

5.17.2

Servicing the SPM

5.17.2.1

Regenerating the SPM

If the neutralization units are loaded for a longer period with certain heavy
metals (e.g. iron) or organic impurities, these can no longer be completely
removed with the standard regeneration solution (100 mmol/L HClO

4

).

The capacity of the neutralization units and the detection sensitivity
decrease.

If such capacity problems occur at one or more positions, all neutralization
units must be regenerated with one of the following solutions:

Contamination with heavy metals:
1 mol/L H

2

SO

4

+ 0.1 mol/L oxalic acid

Contamination with organic cationic complexing agents:
0.1 mol/L H

2

SO

4

/ 0.1 mol/L oxalic acid / acetone 5%

Heavy contamination with organic substances:
0.2 mol/L H

2

SO

4

/ acetone

≥ 20%

CAUTION

Pump tubing made of PVC must not be used for solutions containing
organic solvents.

We recommend using the high-pressure pump for regeneration.

Regenerate the SPM as described in chapter 5.12.3.2, page 90.