3 Operation

791 VA Detector

26

3.4 Startup

3.4.1

Preparing the ELCD cell

The ELCD cell must be correctly connected to the HPLC or IC system

before it is filled (see section 2.3 and section 2.4). Then proceed as fol-

lows:

1 Fill reference electrode (only if necessary)

Reference electrode 39 (6.0727.000) is supplied in a filled

condition. However, the KCl electrolyte solution must be re-

placed every 1 to 2 months. Proceed as follows:

Screw Ag/AgCl reference system 40 out of electrolyte vessel

41 (see Fig. 5).

Fill electrolyte vessel 41 to the brim with c(KCl) = 3 mol/L.

Screw Ag/AgCl reference system 40 back onto electrolyte

vessel 41. Take care that no air bubbles are found in the elec-

trolyte vessel (to check: hold reference electrode against the

light).

2 Connect reference electrode

Insert reference electrode 39 into cell body 32 (see Fig. 5).

Connect reference electrode 39 to connection 17 of the 791

VA Detector with 6.2120.020 Cable (see Fig. 7).

3 Connect auxiliary electrode

Connect the auxiliary electrode in cell body 32 to connection

15 of the 791 VA Detector 791 with 6.2120.020 Cable (see

Fig. 7).

4 Prepare working electrode

Prepare and polish working electrode 28 according to section

3.2.1.

Insert working electrode 28 into cell body 32 (see Fig. 5).

Do not connect working electrode 28 to the 791 VA Detector

at this point.

5 Start pump

Switch on delivery drive of HPLC or IC pump.