beautypg.com

2 cable connections, Cable connections, Figure 28 – Metrohm 864 Robotic Balance Sample Processor User Manual

Page 51: Cabling

background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

864 Robotic Balance Sample Processor

■■■■■■■■

43

5

Pipetting tubing
6.1805.130 FEP tubing

800 Dosino (on empty bottle P)

— 864

tower 1, pipetting tip adapter

6

Titration tubing
6.1805.120 FEP tubing

800 Dosino (titrant T)

— 864 tower 2, titra-

tion tip

7

Solvent feed line (Solvent)
6.1805.120 FEP tubing

800 Dosino (solvent S)

— 864 tower 2, dos-

ing tip

3.14.2

Cable connections

1

2

5

6

9

8

10

11

12

843

Ion

B

864

809

PC

tiamo

TM

800

800

T1

T2

USB
COM1

3 4

7

S

T

P

Figure 28

Cabling

1

Pump connection
6.2141.300 connection cable.

843 Pump Station (Remote 2)

— 864:

tower 2 (pump 1 and pump 2)

2

Ionizer connection
Ionizer (control device)

— Ionizing bar

The connection cable is supplied with the
ionizer.

3

Stirrer cable
Connection cable of the rod stirrer (802 Stir-
rer)
Connector on tower 2 (Stirrer)

4

Swing Head cable
Connection cable of the 786 Swing Head
Connector on tower 2 (Swing Head).

5

Balance connection
RS-232 serial connection cable. Supplied
with the balance.

Balance (RS 232)

— PC (COM1)

6

USB connection
6.2151.000 controller cable (USB A-MiniDIN
8p)

864 (Controller)

— PC (USB)