beautypg.com

Metrohm 754 Dialysis Unit User Manual

Page 20

background image

2.3 Attaching the accessories

754 Dialysis Unit

17

2.3.5

Connecting the dialysis cell

To connect the dialysis cell to the IC system proceed as follows (see

Fig. 8):

1 Tubing connections for acceptor solution

Mount a PVDF compression fitting 50

50 (6.2744.000) on the

end of PEEK capillary 24

24 projecting from feedthrough 27

27 (see

Fig. 5).

Screw PEEK capillary 24

24 to inlet opening 42

42 of the bottom

part 35

35 of the cell (see Fig. 7).

Mount a PVDF compression fitting 50

50 (6.2744.000) to the end

of PEEK capillary 25

25 projecting from feedthrough 27

27 (see Fig.

5).

Screw PEEK capillary 25

25 to outlet opening 41

41 of the bottom

part 35

35 of the cell (see Fig. 7).

2 Tubing connections for sample

Mount a PVDF compression fitting 50

50 (6.2744.000) on the

end of the PTFE capillary 33

33 connected to pump tubing 30

30.

Screw PTFE capillary 33

33 to inlet opening 43

43 of the top part 38

38

of the cell (see Fig. 7).

Mount a PVDF compression fitting 50

50 (6.2744.000) to one

end of the PTFE capillary 45

45 (6.1803.040; L = 1 m).

Screw PTFE capillary 45

45 to outlet opening 44

44 of the top part

38

38 of the cell (see Fig. 7).

Do not connect the dialysis cell with anything other than the

6.2744.000 PVDF compression fittings supplied. If 6.2744.010

PEEK compression fittings are used, stress cracks may appear in the

dialysis cell !