beautypg.com

2 installation, 1 setting up the instrument, Packaging – Metrohm 754 Dialysis Unit User Manual

Page 10: Check, Location, Arrangement of the instruments, 2 mains connection, Setting the mains voltage, Fuses, Mains cable and mains connection

background image

2.1 Setting up the instrument

754 Dialysis Unit

7

2

Installation

2.1

Setting up the instrument

2.1.1

Packaging

The 754 Dialysis Unit is supplied together with the separately packed

accessories in special packagings containing shock-absorbing foam

linings designed to provide excellent protection. The actual instrument

is packed in an evacuated polyethylene bag to prevent the ingress of

dust. Please store all these special packagings as only they can assure

damage-free transport of the instrument.

2.1.2

Check

After receipt, immediately check whether the shipment is complete and

undamaged (compare with delivery note and list of accessories in

section 5.2). In the case of transport damage, see instructions in

section 5.4.1 "Warranty".

2.1.3

Location

Position the instrument in the laboratory at a location convenient for

operation, free from vibrations and protected against a corrosive

atmosphere and contamination by chemicals.

2.1.4

Arrangement of the instruments

To make the connections with the tubing supplied, position the 754 Di-

alysis Unit immediately under the 733 IC Separation Center. The other

units (732 IC Detector, 709 IC Pump, 753 Suppressor Module) can be

arranged as required.

Take precautions to ensure that any leaks from pump tubings or

connections cannot cause more damage.