Prescolite SCIBX User Manual
Sh e e t
In
s
tr
u
c
tio
n
S
h
e
e
t
Part No...........................................
With representatives offices in principal cities throughout North America.
Copyright , revision, All Rights Reserved - Printed in U.S.A.
701 Millennium Blvd., Greenville, SC 29607
w
w
w
.p
re
s
c
o
lit
e
.c
o
m
P
re
s
c
o
lit
e
T
o
ll
F
re
e
T
e
c
h
n
ic
a
l S
u
p
p
o
rt
1
.8
8
8
.P
R
S
.4
T
E
C
H
o
u
rs
: 8
a
m
-
5
p
m
E
T
IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information and instructions
concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials, and proper lamping. Do not
install in areas subject to combustible vapors or gases. Before wiring to power supply and during servicing or relamping, turn off power at
fuse or circuit breaker. All servicing or relamping must be performed by qualified service personnel. Product must be grounded to
avoid potential electric shock or other potential hazard. Product must be mounted in locations and at heights and in a manner
consistent with its intended use, and in compliance with the National Electrical Code and local codes. The use of accessory
equipment not recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light
emanating from product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or
the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.
93010073
Sheet 1 of 2
2012
09/25/12
INSTALLATION INSTRUCTIONS
SCIBX
WARNING: Thermal insulation may be installed in direct contact with the fixture, but DO NOT install insulation in
excess of eight inches deep above fixture. Greater depth may cause the thermal protector to cycle the fixture on or
off.
WARNING: Use only those trims, lamps, and maximum wattages proper for this fixture, as indicated on the label
within the housing (3).
WARNING: National Electrical Code, Article 110-3 (b), states that “Listed or labeled equipment shall be used or
installed in accordance with any instructions included in the listing or labeling”. Use only Prescolite UL listed trims.
Use of other trims not listed in this fixture, including those that are UL classified, is a violation of N.E.C. 110-3 (b)
and voids all warranties.
WARNING: This product contains chemicals known to the State of California to cause cancer, birth defects, and/or
other reproductive harm. Thoroughly wash your hands after installing, handling, cleaning, or otherwise touching this
product.
WARNING: If any special control devices are used with this fixture, follow the instructions carefully to assure full
compliance with N.E.C. requirements. If there are any questions, contact a qualified electrical contractor.
1. For Wooden Joists: Extend the Bar Hangers (6), use joist alignment tabs (4) to locate fixture and position
underneath the support joist (8). Drive the 4 Nails (7) into Joists (8) (Fig. 1). Drive additional nails through holes in
Bar Hanger for alternate support if required.
2. For Suspended Ceilings: Place the Fixture on the ceiling grid with the "T" Bars (9) running through the Bar Hanger
Notches (10). Using a flat head screwdriver or other tool, bend the integral t-bar mounting tabs (11) downward to a
vertical position (Fig. 3). Secure housing to the support structure with tie wire (supplied by others) in the holes
supplied. Sheetmetal screws (supplied by others) can also be used in the holes supplied (20).
3. Locate Housing along Bar Hanger in desired position and, using pliers, squeeze the 4 Locking Tabs (12) on the
Plaster Frame (13) tightly over the Bar Hangers to prevent further Housing movement. Set Screws are also provided
that can be tightened to lock the housing position on the Bar Hangers.
4. As desired, hanger bars (6) may be shortened at score mark to fit tight mounting conditions and joist alignment
tabs removed to adjust vertically as needed by breaking off with pliers.
5. Unsnap Junction Box Cover (14) by lifting the Leaf Spring (24).
6. Run supply wires through UL Listed connectors (not supplied) in one of the five Pryouts (15) on the Junction Box
(16) or Type NM cable (ROMEX) through an Opening above the Wire Retaining Plate (17). Connect Supply Wires
(19) as shown in Fig 4 & 5. Replace Cover.
7. Adjust position of socket (21) by loosening thumbscrew (26) and rotating bracket socket (18). Retighten
thumbscrew (Fig.7).
8. FOR AIR-TIGHT APPLICATIONS: This Prescolite product is Air-Tight approved per ASTM E283 testing
standards and complies with Washington State Energy Code Requirements. To complete the installation of this Air-
Tight product, the opening between the housing (3) and drywall ceiling (22) must be sealed by the installer using
silicone caulking, tape, or any other means acceptable to the local codes official. Prescolite accessory gasket kit G6
(purchased separately) can be used for this purpose (Fig. 6).
9. Select a Trim from the Wattage Label inside the Housing. Use Only Lamp Types approved for the Trim chosen.
DO NOT EXCEED MAXIMUM LISTED WATTAGE(S)!
10. To gain access to junction box (16) after ceiling is finished, remove screw (2) and access door (5) inside of
fixture. Junction box cover plate (14) can now be removed for service.
INSTRUCTION SHEET MUST BE REMOVED FROM FIXTURE PRIOR TO ENERGIZING.