Prescolite CFCB813/818/826/832/842EB/EBDM/EB 347V User Manual
Instruction sheet

www.prescolite.com
• Prescolite
TollFree
Technical
Support
1.888.PRS.4TEC
•
Hours:
8am
- 5pm
ET
701 Millennium Boulevard, • Greenville, SC 29607
With representatives offices in principal cities throughout North America.
Copyright 2013, 7/9/13 revision, All Rights Reserved - Printed in U.S.A.
Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141780100
IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information and instructions concerning wet or damp
locations, installation near combustible insulation or building materials, and proper lamping. Do not install in areas subject to combustible vapors or gases. Before
wiring to power supply and during servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by qualified
service personnel. Product must be grounded to avoid potential electric shock or other potential hazard. Product must be mounted in locations and at heights
and in a manner consistent with its intended use, and in compliance with the National Electrical Code and local codes. The use of accessory equipment not
recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from product in whole or
part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or the like to come into contact with the product or to block
light from the product, as this may cause an unsafe condition.
WARNING - This product contains chemicals known to the State of California to cause cancer, birth defects and/or other reproductive harm. Thoroughly wash
hands after installing, handling, cleaning, or otherwise touching this product.
Instruction
Sheet
INSTALLATION INSTRUCTIONS FOR: CFCB626/642, 818/826/832/842EB/EBDM/EB 347V
Detail A
Wing Nut
Ballast Assembly
Low voltage dimming leads gray
and violet – place in conduit as
required by code
Adjustable mounting brackets (2)
are supplied flat. To ensure proper
alignment, bend brackets in line
with the marks on the flange as
shown in detail A.
7. a) Push spring up on one side and insert
into plaster frame as shown.
(For 6" lower reflector only)
b) Push spring up on opposite side and
insert into plaster frame.
(For 6" lower reflector only)
c) Allow lower reflector to pull up into
frame.
8. To remove lower reflector, pull down on
flange. Position hands opposite of spring
location to avoid any spring snap- back.
SEE NOTE 7
SEE NOTE 8
SPRING
(Illustration shown with 6" lower reflector)
(Illustration shown with 6" lower reflector)
A
B
c
8" Lower Reflector
LOWER REFLECTOR
LOUVER BLADE
SPRING
Spring
Louver Blade
1. Bend brackets as shown. Install the fixture in
the ceiling using mounting channel, bar, 1/2”
EMT (by others) or B-24 barhanger (by
Prescolite) placed in the adjustable mounting
brackets. Mount the fixture in the ceiling so
that the weight of the fixture is supported by
the mounting channel or bar and/or hanger
wires secured to the building structure.
2. Adjust the fixture so the bottom of the
plaster flange is flush with the finished
ceiling line and in alignment with adja
cent fixtures. Secure mounting
brackets by tightening wing nuts on
either side of the fixture.
3. Determine where the supply wiring
conduit will enter the j-box and
attach it in conformance with
National Electric Code.
4. Remove j-box cover. Connect power
supply leads to black (line) and white
(common) ballast leads. Connect ground
wires to green ground wire. Connect ballast
and socket leads using quick-connect plugs.
Reinstall j-box cover.
WARNING: Do not
pinch wires between j-box cover and j-box!
5. Install the proper lamps (by others).
6. After all the ceiling installation and finishing
work is complete, position the lower reflector
so that if the reflector is a:
a. Virtual Baffle (see
detail B), a louver blade is
in line with the lamp(s) or
align louvers to match adjacent
reflectors.
7. Push the reflector into the plaster flange
until the flange on the reflector is flush
against the ceiling.
a. Push spring up on one
side and insert into plaster frame
as shown. (For 6” lower reflector only)
b. Push spring up on
opposite side and insert
into plaster frame. (For 6” lower
reflector only)
c. Allow lower reflector to pull
up into frame.
8. To remove lower reflector,
pull down on flange. Position hands
opposite of spring location to avoid
any spring snap-back.
Spring
Lower Reflector
8” Lower Reflector
6” Lower Reflector