Muster – Memmert PM 200/400/500 Pump Module (Generation 2003) User Manual
Page 31
![background image](/manuals/567639/31/background.png)
VO
Muster
page 31
Language
Settings: GERMAN, English, franCEAIS, ESPANOL and italIANO
Vent connection select IN1 or IN2 (option)
Settings: IN1 or IN2
e.g. IN1 for fresh air and IN2 for inert gas
Calibration correction for user-calibration of temperature.
CAL1
to CAL3
ADJUST – TEMPERATURE CALIBRATION
READJUST – TEMPERATURE CORRECTION
(see Section: „Calibration“)
Calibration correction for user-calibration of vacuum.
CAL1
to CAL3
ADJUST – VACUUM CALIBRATION
READJUST – VACUUM CORRECTION
(see Section „Calibration“)
Exit setup mode
= store all settings and exit SETUP mode.
22.1 Real-time clock
The real-time clock is set in SETUP and includes date and clock time.
The real-time clock serves for documentation according to GLP.
Date and clock time are marked in the report print.
On the graphics print the time axis is marked in real-time.
The clock runs with a buffer battery independently of the mains power supply.
The built-in lithium battery Type CR 2032 has a life of approx. 10 years.