beautypg.com

6 commissioning, Before switching on, Commissioning – Lenze EMF2181IB User Manual

Page 31

background image

Commissioning

Before switching on

6

l

31

EDSMF2181IB EN 3.0

6

Commissioning

6.1

Before switching on

(

Stop!

Prior to switching on the mains voltage, check the wiring for completeness,
short−circuit and earth fault.

Automatic address assignment and automatic detection of the baud rate

The device is equipped with the following functions:

ƒ

Automatic address assignment

ƒ

Automatic detection of the baud rate

Both functions are used to prevent malfunctions in operation due to incorrectly set user
addresses and baud rate.

)

Note!

In default setting these functions are not activated.

Please refer to the related instructions on the codes

ƒ

C0350: "General address assignment" (

48)

ƒ

C0351: "Set baud rate" (

49)

Configuring the country−specific code

Before the 2181 communication module is connected to the telephone network, it may be
required to configure the country−specific code.

)

Note!

Observe the description for code C1208 (

63).