beautypg.com

4 operating conditions, Operating conditions, Safety – Leica Biosystems CM1520 User Manual

Page 11

background image

11

Leica CM1520 – Cryostat

2. Safety

2.4 Operating conditions

Transport and installation

• After transporting, do not turn the instrument on for a minimum of 4 hours.

• Do not operate the instrument in rooms with explosion hazard.

• To ensure proper function, the instrument must be set up with

the following minimum clearance to walls and fixtures on all sides:

- rear: 15 cm

- right: 30 cm

- left:

15 cm

Electrical connection

• Before connecting the instrument to an AC power outlet, ensure that the

AC power of your laboratory matches the values on the nameplate of the

instrument.

• During the start-up of the refrigeration system, the minimum nominal

voltage must not drop below the values specified in Chapter 3, "Technical

Data".

The compressor draws a starting current between 45 and 50 A.

Therefore, the electric circuit at the place of installation must be inspected

by an electrical engineer to ensure that it meets the requirements for a

smooth operation of the instrument.

A stable power supply in accordance with the instrument's specifications

is essential to its proper functioning.

Failure to comply with the above can damage the instrument.

This waiting period is necessary to allow the compressor oil, which may

have been displaced during transport, to return to its original position.

Failure to comply with this may cause damage to the instrument.

• No additional extension cable may be used.

Defrosting

• The quick freeze shelf can become very hot during the defrosting process.

Therefore, do not touch it!