Xit6000-ca, 3/8” tie-lok, Tool – BAND-IT XIT 6000-CA 3/8 Tie-Lok Tool User Manual
Page 36
Document # XIT177 Rev E
© Copyright
BAND-IT-IDEX, Inc. 2005
All rights reserved
www.BAND-IT-IDEX.com
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street Denver, CO 80216-3070 USA
P: 1-800-525-0758 F: 1-800-624-3925
36
XIT6000-CA
3/8” Tie-Lok
®
Tool
Tension Cylinder
Pressure Monitoring
System
1. Begin with Start Menu:\Programs\
Accessories\Communications\HyperTerminal
2. Type a connection name.
3. Click OK
4. “Connect to” dialog box appears
5. In the "Connect Using” text box,
choose COM1, Click OK
6. Properties dialog box appears
7. Port Settings should be:
•
Bits per second (2400)
•
Data bits (8)
•
Parity (None)
•
Stop bits (1)
•
Flow control (NONE)
Click OK
8. Hook up control box, two lines of header
information will appear on the screen:
Program / clamp, etc. Upon
connection, the current clamp
information and tool serial # will
appear. Tool is now ready.
9. To capture data- click Transfer, then click
Capture Text, enter a file name and
location, then click Start. *NOTE!
*Data will not be saved unless “stop”
is selected from this same menu.
To check the cut-off delay timing, hold down the reset button on the breakout box for 3 seconds. You will see “Ready to
check timing” appear on the screen. Activate the tool and it will display the delay duration in decimals of seconds. Hold
down reset button for 3 seconds to return to main menu. See page 34.
(Example of data collection using a Windows XP Operating System)