Xit6000-ca, Maintenance, Preventative maintenance schedule – BAND-IT XIT 6000-CA 3/8 Tie-Lok Tool User Manual
Page 22: 3/8” tie-lok, Tool
Document # XIT177 Rev E
© Copyright
BAND-IT-IDEX, Inc. 2005
All rights reserved
www.BAND-IT-IDEX.com
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street Denver, CO 80216-3070 USA
P: 1-800-525-0758 F: 1-800-624-3925
22
XIT6000-CA
3/8” Tie-Lok
®
Tool
The XIT6000-CA requires preventative maintenance as indicated below. The “Clamps
Installed” column indicates how many clamps can be installed between each servicing.
Maintenance
Replace gripper
Front Gripper
50,000
Replace Assembly
Tension Block Assembly
50,000
Clean, re-lubricate, and inspect for
multiple broken teeth
Front Gripper
25,000
Rotate (page 18)
Cut-off Blade
25,000
Clean & Re-Lubricate
Tool Head
25,000
Clean & Re-Lubricate
Flip Cover
12,500
Clean & Re-Lubricate
Tension Block Assembly
12,500
Maintenance
Action
Maintenance
Item
Clamps
Installed
Replace
Cut Off Blade
50,000
Replace
Cut-off Knife Assembly
25,000
Clean & Re-Lubricate
Mechanical Linkage
25,000
Preventative Maintenance Schedule
Tool Preventative Maintenance:
The tool has some wear components that must be checked and replaced on a certain
schedule. BAND-IT has developed a Preventative Maintenance (PM) schedule to help
facilitate these requirements. An excerpt from this PM Schedule is shown below. If tools
are experiencing difficulties during function or there audible air leaks coming from inside
the handle, the tool should be returned to BAND-IT-IDEX, Inc. for servicing.