beautypg.com

Xit6000-ca, Setup & assembly instructions, 3/8” tie-lok – BAND-IT XIT 6000-CA 3/8 Tie-Lok Tool User Manual

Page 10: Tool

background image

Document # XIT177 Rev E

© Copyright

BAND-IT-IDEX, Inc. 2005

All rights reserved

www.BAND-IT-IDEX.com

BAND-IT-IDEX, Inc.

A Unit of IDEX Corporation

4799 Dahlia Street Denver, CO 80216-3070 USA

P: 1-800-525-0758 F: 1-800-624-3925

10

XIT6000-CA

3/8” Tie-Lok

®

Tool

Setup &

Assembly

Instructions

Handle adjustment:

• Using 1/4” hex key (supplied), adjust
the Support Arm/Handle to ergonomically
match the operators hand.

• Be sure not to adjust the Handle too far
outward (beyond interlocking legs) or the
handle will not function properly or
provide support to the operator.

Hanger Support Instructions:

1. A steel hanger can be utilized for

supporting the tool with a
counterbalance. Full weight of tool
should not be supported by a single
hole.

2. A hanger can be installed (as

shown) into one of the three
supplied threaded holes. To
prevent internal damage, only 1/8”
of the hanger threads should be
threaded into the hole.

3. Secure the hanger against the tool

body with a lock nut as shown. This
will prevent movement of the
hanger during tool operation.

4. Use a light application of Loctite,

Red, high-strength, on threads of
hanger prior to installation.

Hanger Mount