BAND-IT Ties Installation User Manual
Band-it ties, Installation instructions
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
Page 1 of 1
BAND-IT Ties
BAND-IT Company Limited
A Unit of IDEX Corporation
Speedwell Industrial Estate
Staveley, Nr. Chesterfield
Derbyshire, S43 3PF England
P: (44) 1246-479479
F: (44) 1246-479480
BAND-IT Clamps (Asia) Pte. Ltd.
11 Second Chin Bee Road
Singapore 618777
P: 65-6265-8853
65-6265-8783
F: 65-6265-8902
www.BAND-IT-IDEX.com
www.BAND-IT.co.uk
Document # P91787 rev. F
© Copyright
BAND-IT-IDEX, Inc. 2008
All rights reserved
www.BAND-IT-clamps.com
Installation
Instructions
Refer to website for warranty information:
http://www.band-it-idex.com/warranty.html
Maximum Operating Temperature: Coating = 300
°F (149°C)
Rated Load (Loop Tensile Strength, single wrap) :
1/4” Tie = 75 LBS
3/8” Tie = 100 LBS
5/8” Tie = 200 LBS
Rated Load (Loop Tensile Strength, double wrap) :
1/4” Tie = 300 LBS
3/8” Tie = 500 LBS
5/8” Tie = 800 LBS
1. Wrap BAND-IT tie around object with the
locking ears up. Wrap per diagram at left.
2. Tighten BAND-IT ties with one of these
(listed in order of increasing tension):
• By
hand,
• BAND-IT AE201 Tensioning Hook,
• BAND-IT AE200 Tensioning Tool,
• BAND-IT C075 Bantam Tool.
3. Bend tail back over raised bridge.
4. Secure tail under ears by slightly pushing
the tail sideways and down, first one way
then the other.
5. Tail may be left on for re-use.
6. Optional: Hammering down the bridge may
increase the strength of the lock, but will not
allow the clamp to be re-used.