beautypg.com

It1000-ab, Maintenance, Preventative maintenance schedule – BAND-IT IT1000-AB 1/4 Tie-Lok Tool User Manual

Page 21: 21 of 38, 1/4” tie-lok, Tool

background image

Document # I17791 Rev H

© Copyright

BAND-IT-IDEX, Inc. 2009

All rights reserved

www.BAND-IT-IDEX.com

BAND-IT-IDEX, Inc.

A Unit of IDEX Corporation

4799 Dahlia Street Denver, CO 80216-0307 USA

P: 1-800-525-0758 F: 1-800-624-3925

21 of 38

IT1000-AB

1/4” Tie-Lok

®

Tool

Replace Gripper

Front Gripper

Replace Assembly

Tension Block Assembly

Clean & Re-Lubricate

Front Gripper

Rotate

Cut-off Blade

Clean & Re-Lubricate

Tool Head

Clean & Re-Lubricate

Flip Cover

Clean & Re-Lubricate

Tension Block Assembly

Every 12,500

Maintenance

Action

Maintenance

Item

Clamps

Installed

Replace

Blade, Blade pin, Knife

and Knife pin

Every 50,000

Rotate

Cut-off Knife

Clean & Re-Lubricate

Mechanical Linkage

Every 25,000

Preventative Maintenance Schedule

Tool Preventative Maintenance:
The tool has some wear components that must be checked and replaced on a certain
schedule. BAND-IT has developed a Preventative Maintenance (PM) schedule to help
facilitate these requirements. If tools are experiencing difficulties during function or there
audible air leaks coming from inside the handle, the tool should be returned to BAND-IT-
IDEX, Inc. for servicing.

BAND-IT recommends that the tool be sent in for general overhaul every 100,000 clamps
installed.

Maintenance