Lull 1044C-54 Series II Service Manual User Manual
Page 240

Boom and Transfer
6-98
31200079
d. Lay upper chain flat on top of inner boom section.
30. Lift inner boom section and slide it into middle (front) boom section.
Fig. 6-104: Upper Slide Pad Installation – Front of Middle (Forward) Boom
Section
31. (Ref. Fig. 6-104) After applying thread locking compound to the
capscrews, install two (2) upper slide pads (Item 4) and shims (Item 3)
on front of middle (forward) boom section with lockwashers (Item 2)
and capscrews (Item 1) according to drawing specifications. Torque
capscrews to 180 in-lbs.
32. Lift middle (forward) and inner boom sections and slide them into
middle (rear) boom section.
J
124
5
1
2
3
4
#
Description
1
Button-Head Socket Capscrew
2
Lockwasher
#
Description
3
Shim
4
Front Upper Slide Pad
J
124
4
7
8
9
10
1
2
2
3
6
5
4