Peak sheet ridge installation – Mueller Pre-Fab User Manual
Page 76

877-2-MUELLER
F-2
PeaK sHeeT RIDGe InsTallaTIon
Peak sheet ridge panels are to be installed as each side of the roof is sheeted . This will aid in
keeping both sides of the roof aligned . After having installed a run of panels on each side of the
roof, apply sealant to the panels as shown . Set die formed ridge panel in place and install lap and
purlin fasteners . Apply sealant tape along the top of the leading rib to prepare for the next sidelap .
Ridge
Purlins
See Building
Erection
Drawings for
Dimension
Sealant
Tape
Roof
Fasteners
Die Formed
Ridge
noTe: Do not walk on unsecured ends of panels.