Roof insulation – Mueller Pre-Fab User Manual
Page 41

www.muellerinc.com
D-3
Roof InsUlaTIon
Pre-cut roof insulation to reach from eave to eave allowing approximately 2 feet of additional
length to facilitate handling . Hold insulation at one sidewall and roll out insulation across the
purlins, vapor barrier to the inside of the building . Stretch the insulation to provide a tight and
smooth inside surface .
noTe: Insulation has no load bearing strength. Maintain body weight on
approved scaffold or walk boards.