Installation of wind bracing (continued) – Mueller Pre-Fab User Manual
Page 36

877-2-MUELLER
C-16
InsTallaTIon of WInD bRacInG (conTInUeD)
Occasionally the bracing in the wall of a building cannot be installed in the specified bay because
of doors or other complications . Usually these can be moved to other bays without affecting the
structural integrity of the building .
However, before moving any wind bracing check with
Mueller, Inc. Do not remove after building is erected.
Hex Nut
Flat Washer
Hillside Washer
Web of Column
Eyebolt
Cable
noTe: never modify a Mueller building without first contacting
a Mueller representative.