Screw alignment (continued) – Mueller Pre-Fab User Manual
Page 50

877-2-MUELLER
E-4
scReW alIGnMenT (conTInUeD)
The template panel should be laid out for the proper screw locations in accordance with the
building erection drawings . Since pre-drilling will “hand” the panels, it will also be necessary to
select the end of the building from which the paneling is to begin . Before drilling the template
panel, it should be checked for proper hole locations against the building framework . Be sure there
is no excessive deflection in the purlins and girts .
2"
1
1
/
4
˝
3
/
4
˝
1
1
/
2
˝
1˝ - 1
1
/
2
˝
12˝ Lap
1˝
Dimensions subject to
variations. Check building
erection drawings.