Installing a new system, Unpacking – Avaya IP Office Phone User Manual
Page 38
Page 38 - Unpacking
Installing a New System
Page 38 - Installing a New System
IP Office Installation Manual
Unpacking
40DHB0002USCL – Issue 9 (28th October 2003)
Installing a New System
Unpacking
Before proceeding with installation, ensure that you have read the notes covered in
Preparing for Installation on page 32.
Unpacking and checking :
1. Before unpacking check for any signs of damage that has occurred during transit.
If any damage exists bring it to the attention of the carrier.
2. Check all cartons against the packing slip and ensure that you have the correct item as
per the country variants (see page 28).
Report any errors or omissions to the equipment supplier.
3. While unpacking the equipment, retain all the packaging material.
Fault returns are accepted only if repackaged in the original packaging.
4. Visually inspect each item and check that all the necessary documentation and
accessory items have been included. Report any errors or omissions to the dealer who
supplied the equipment.
5. Ensure you read and understand any documentation included with any item.