Page 32 - Introduction

Preparing for Installation

Page 32 - Preparing for Installation

IP Office Installation Manual

Introduction

40DHB0002USCL – Issue 9 (28th October 2003)

Preparing for Installation

Introduction

This section reviews the requirements for installing an IP Office system. You must meet
these requirements for the system to operate safely and in the intended manner.
This section covers :
Tools & Parts Required on page 32.
Space requirements on page 33
Environmental requirements on page 33.
Power Supply requirements on 34

Tools & Parts Required

General :
– Pozidrive No. 1 screwdriver for removal of unit covers.
– Cutter/knife for cable ties.
– Cable ties - 3mm x 50mm.
– Pozidrive No. 4 screwdriver for Analog Trunk 16 expansion module grounding post.

Note: In addition, ensure that you have sufficient cables that are not supplied with the

modules, e.g. Line Cords for structured cabling (see page 67) and power supply
cables (see page 30).

Programming :
These are the tools required for programming of a newly installed IP Office system.
– PC running Windows 95 (pre-level 2.0+ software only), 98/2000/ME/XP or NT with the

following specification:
Intel Pentium ll 333Mhz or faster, 100MB HD space, CD-ROM drive, COM port,
terminal emulation (e.g. HyperTerminal) and a super VGA Monitor (set to 1024x768).

– PC with a LAN card with either a fixed IP address (allocated by your system

administrator) or be using DHCP to obtain an IP address.

IP Cat. 5E patch cable (red – supplied with system see page 69).
– IP Office Administration CD (supplied with system).
– IP Office Manager Application Manual (supplied on CD with system).
– IP Office Feature Key (where software that requires a Licence Key is to be installed).