Installation Site Checklist

This checklist should be completed by the electrician after the wiring has been completed:

Installed at (company name, date, contact)__________________________________________

Name and telephone number of electrician: ___________________________________________

UPS serial number: ______________________________________________________________

Input Circuit Breaker size and type: _________________________________________________

Output fuse size and type: ________________________________________________________

Location of protection devices (room):______________________________________________

Breaker ID: ___________________________________________________________________

EPO type: ____________________________________________________________________

Wire size and type: _____________________________________________________________

Ground connection method and location: ________________________________________