beautypg.com

Wiring – American Power Conversion 10-30 KVA User Manual

Page 33

background image

Electrical Installation – Wiring

990-1598B

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

27

Wiring

Note

Make sure the UPS is in its location of use before wiring begins.

CAUTION!
Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection is
present.

Note

Power terminal lug diameter: minimum 0.2 in/6 mm.
Torque value: 45 lbf-in/7Nm.

Note

If floor anchoring is required, attach the Floor Anchoring Brackets to the UPS now.
Follow step 1 under Floor Anchoring (Option).

Note

Please leave a copy of your wiring diagram with the customer to facilitate maintenance
and troubleshooting.

This manual is related to the following products: