Electrical Installation – Communication Wiring to EPO and Optional

990-1598B

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

35

XR Enclosure, APC Maintenance Bypass Panel, and Generator Control wiring

Pins 1 through 4 are for battery measurement (only applicable to APC XR Enclosures).

Pins 5 through 6 are for external maintenance bypass Q3.

Pins 7 and 8 are for external charge control.

Note

When connecting the Q3 auxiliary signal, use gold-plated N/C auxiliary switch on Q3.

8
7
6
5
4
3
2
1

J106

Q3
switch

Charging control switch

J200 (XR Batteries)

4
3
2
1