Electrical Installation – Input/Output Wiring – Dual Mains

990-1598B

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

31

 Punch 3 holes in the Conduit Box bottom to fit the size of the conduit pipes, and reattach the

Conduit Box bottom to the Enclosure, re-using the (4) M4 screws.

 Install conduit pipes in the Conduit Box bottom.

 Run cables through the conduit pipes and the bottom of the Conduit Box. Guide the cables

behind the bar and up into the input/output area.

 Reinstall the top part of the Conduit Box to the Enclosure, following reverse deinstallation

procedures (described in a previous step).

 Remove the (2) M6 screws from Brackets A, B, and C and remove all 3 brackets.

 Attach input cable lugs to L1, L2 and L3 input busbars (left side in the UPS – on the front of the

busbar), using the provided M6 torx screws. Attach bypass cable lugs to L1, L2, L3 bypass
busbars, using the provided torx screws. Attach output cable lugs to L1, L2, L3 output busbars,
using the provided torx screws.
Attach N x 3 where shown., using the provided torx screws.

 Attach Ground x 3 where shown.

 Fasten all cables with cable ties.

 Reinstall rear cover.

L

1

L

1

L

2

L

3

L

1

L

2

L

2

L

3

N

L

3

N

N

Neutral

Bypass
input
cables

Neutral

Neutral

Ground
cables

Output
cables


Utility
input
cables