beautypg.com

American Power Conversion 10-30 KVA User Manual

Page 35

background image

990-1598B

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

29

 Loosen the (4) M4 screws (2 each side) from the bottom part of the Conduit Box and remove.

 Punch 2 holes in the marked areas of the Conduit Box bottom to fit the size of the conduit pipes,

and reattach the Conduit Box bottom to the Enclosure, re-using the (4) M4 screws.

 Install conduit pipes in the Conduit Box.

 Run cables through the conduit pipes and the bottom of the Conduit Box, pull behind the bar

and up into the input/output area.

 Reinstall the top part of the Conduit Box to the Enclosure, following reverse installation

procedures.

 Attach input cable lugs to L1, L2 and L3 input busbars (left side in the UPS – on the front of the

busbar), using the provided M6 torx screws. Attach output cable lugs to L1, L2 and L3 output
busbars, using the provided M6 torx screws. Attach N x 2 where shown, using the provided torx
screws.

 Attach Ground x 2 where shown, using the provided torx screws.

 Fasten cables with cable ties.

 Reinstall rear cover.

L

1

L

1

L

2

L

2

L

3

N

L

3

N

Ground
cables

Mains
input
cables

Neutral



Neutral

Output
cables

This manual is related to the following products: