beautypg.com

Pin connections j108 (for epo wiring options) – American Power Conversion 10-30 KVA User Manual

Page 42

background image

Electrical Installation – Communication Wiring to EPO and Optional Equipment

36

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

990-1598B

Pin connections J108 (for EPO wiring options)

EPO switch wiring.

The UPS must be connected to either a dry contact or a 24V

DC

Emergency

Power Off (EPO) switch.

Connect the EPO cable, using one of the following 4 wiring configurations.

1
2
3
4
5
6

J108

EPO circuit

1
2
3
4
5
6

J108

1
2
3
4
5
6

J108

1
2
3
4
5
6

J108

1: Dry Contracts

Normally Open

2: +24V Normally Open

3: Dry Contacts

Normally Closed

4: +24V Normally

Closed

EPO circuit

EPO circuit

EPO circuit

EPO is activated when a
connection from pin 3 to pin 5
is opened

EPO is activated when pin 1 is
connected to pins 3, and 5

EPO is activated when an
isolated SELV 24V

DC

voltage

is supplied on pin 1 with
reference to pin 2.

EPO is activated when a SELV
24V

DC

voltage removed from

pin 3 with reference to pin 5

This manual is related to the following products: