beautypg.com

Site preparation, Installation space requirements, Clearance for 20.59 in/523 mm enclosures – American Power Conversion 10-30 KVA User Manual

Page 16

background image

10

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

990-1598B

Site Preparation

Installation Space Requirements

Clearance for 20.59 in/523 mm Enclosures

*) Minimum free rear space for ventilation 4 in/100 mm.

Space requirements

in

mm

Minimum clearance above Enclosure (A)

20.00

508

Enclosure depth (B)

32.99

838

Enclosure width (C)

20.59

523

Minimum rear service clearance* (compliant with NEC 110.26 for
North America) (D)

36.00

914

Minimum front clearance (E)

40.00

1,000

Conduit Box, depth (F)

3.46

88

No side clearance required (add width of Stabilizing Brackets for
floor anchoring if applicable)

0

0

Stabilizing Bracket width

3.34

85

Total installation depth, inclusive of Front Panel, Conduit Box and
minimum front and rear clearances (G)

112.45

2,840

(E)

(D)

(A)

UPS

Conduit Box
(F)

(B)

(G)

(C)

This manual is related to the following products: