Mechanical assembly – Floor Anchoring

990-1598B

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

21

Floor anchoring of stand-alone systems

In seismic areas, it is recommended that the installation be bolted to the floor, and that the batteries be
secured in the Enclosure by the Battery Securing Brackets.

 For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet

during transport.

 Align the 4 holes in the bottom angle of the Floor Anchoring Bracket on either side of the

Enlosures to the pre-drilled holes in the floor

Front Panel

Note

Recommended minimum number of floor bolts per Enclosure: 4 (1 in each corner).
Recommended floor bolt size: 5/16(3/8) in/8 mm.

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Model:

Serial:

BATTERY UNIT

Floor Anchoring
Bracket
(re-use of transport
bracket)