beautypg.com

Component parts, A211, Installation instructions – Hubbardton Forge 103040 User Manual

Page 2

background image

Installation Instructions

A211

Flora Chandelier 10-3040

Page 2 of 2

Hand-Forged, Vermont-Made Lighting and Accessories

154 Route 30 South, Castleton, Vermont 05735

22849 Rev A

To Install Opaque Glass

(Figure 2)

Component Parts

I

Retaining Ring (5)

J

Glass (5)

K Socket (5)
L

Socket Tool

1. Remove retaining ring (I) from socket (K). Retaining Rings are shipped

installed.

2. Place glass (J) over socket (K).

3. Replace retaining ring (I) and tighten with socket tool (L) to secure glass.

Do not over-tighten.

4. Install light bulbs.

5. Restore electricity at the main breaker.

To Install Water Glass

(Figures 3 & 4)

Component Parts

I

Retaining Ring (5)

J

Glass (5)

K Socket (5)
M Decorative Ring Cover (5)

1. Remove retaining ring (I) from socket (K). Retaining Rings are shipped

installed.

2. Install retaining ring (I) into decorative ring cover (M). If retaining ring (I)

fits to loose bend a few inside tabs of the decorative ring cover (M)
(Figure 4).

3. Place glass (J) over socket (K).

4. Replace retaining ring (I) and tighten to secure glass. Do not over-tighten.

5. Install light bulb.

6. Restore electricity at the main breaker.



If you need further assistance, or find that you are missing any parts, please
contact the dealer from which you purchased this product. We hope you enjoy
your fixture!

* Hubbardton Forge will not be liable for injury or damage caused by improper
installation, lamping or use of this fixture.

(Figure 2)

(Figure 3)

(Figure 4)