beautypg.com

Allied Telesis x510 Series User Manual

Page 94

background image

Chapter 7: Powering On the Stack

94

Warning

Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3

Note

Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.  E5

2. Wait two or three minutes for the switches to select a master switch

and to assign the ID numbers.

At this point, the stack is operational. The ID numbers are
automatically stored in special files in the flash memories of the
switches and are retained by the devices even if you reset or power
cycle the stack.

3. To continue with the installation, go to “Verifying the Stack” on

page 95.