beautypg.com

Allied Telesis x510 Series User Manual

Page 107

background image

x510 Series Installation Guide for Virtual Chassis Stacking

107

Figure 54. Positioning the SFP Handle in the Upright Position

7. Connect the fiber optic cable to the transceiver, as shown in Figure 55.

The connector on the cable should fit snugly into the port, and the tab
should lock the connector into place.

Figure 55. Connecting a Fiber Optic Cable to an SFP Transceiver

8. Repeat this procedure to install additional transceivers.

SFP Handle