beautypg.com

Unpacking the switch, Figure 19: components of the x510 series switches – Allied Telesis x510 Series User Manual

Page 65

background image

x510 Series Installation Guide for Virtual Chassis Stacking

65

Unpacking the Switch

Figure 19 lists the items that come with the switch. If any item is missing or
damaged, contact your Allied Telesis sales representative for assistance.

Figure 19. Components of the x510 Series Switches

Note

You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.

After checking the contents of the shipping containers, go to Chapter 4,
“Installing the Switches on a Table or in an Equipment Rack” on page 67

Two rack mounting brackets

One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.

Eight bracket screws

Two regional AC power cords