4 confirm operation – APC AP9608 User Manual
Page 10

6
4 Secure the Call-
UPS II
with the screws removed in step 2.
5 Turn on the
UPS
and the protected equipment.
External Version
It is not necessary to turn off the the
UPS
or its load before connecting or
disconnecting the external Call-
UPS II
. When connected, Call-
UPS II
may
cause the
UPS
to beep, or, if the
UPS
is powered off, to power on. This is
normal.
If a device such as a server or workstation is currently using the
communi-
cations
port on the back of the
UPS
, disconnect it now according to the
UPS
connection instructions. Connect that device securely to the
UPS
Monitoring Port on Call-
UPS II
. See Sec.
2.5
to determine if the optional
power adapter is required.
3.4 Confirm Operation
Observe the status indicator on Call-
UPS II
. After a moment it should
be on continuously. If the indicator flashes rapidly, Call-
UPS II
has failed
its power-on self-test. See Chapter 5.
Use only
APC
-supplied cables to connect the external version
of Call-
UPS II
to the
UPS
. Do not connect to any Call-
UPS II
port
except as specified in these instructions. Connections using a
cable or any other manufacturer may cause damage to or
improper operation of Call-
UPS II
, the
UPS
, or the computer.