MAN0236-09

10 NOV 2006

PAGE 5

RTD000/100

This Data Sheet is published individually & also as a part of the SmartStack Supplement (SUP0246-05).

Information is subject to change without notice. SmartStack is a trademark of Horner APG, LLC.

For detailed installation and a handy checklist that covers panel box layout requirements and minimum
clearances, refer to the hardware manual of the controller you are using. (See the Additional
References
section in this document.)

• All applicable codes and standards need to be followed in the installation of this product.

• For I/O wiring (discrete), use the following wire type or equivalent: Belden 9918, 18 AWG or

larger.

Adhere to the following safety precautions whenever any type of connection is made to the module.

• Connect the green safety (earth) ground first before making any other connections.

• When connecting to electric circuits or pulse-initiating equipment, open their related breakers.

Do not make connections to live power lines.

• Make connections to the module first; then connect to the circuit to be monitored.

• Route power wires in a safe manner in accordance with good practice and local codes.

• Wear proper personal protective equipment including safety glasses and insulated gloves

when making connections to power circuits.

• Ensure hands, shoes, and floor are dry before making any connection to a power line.

• Make sure the unit is turned OFF before making connection to terminals. Make sure all

circuits are de-energized before making connections.

• Before each use, inspect all cables for breaks or cracks in the insulation. Replace

immediately if defective.

This manual is related to the following products: