beautypg.com

Changing copy pair status – HP XP P9000 Command View Advanced Edition Software User Manual

Page 212

background image

TIP:

As of Replication Manager version 6.3, mainframe pair status information can be obtained using
Device Manager (without HP StorageWorks P9000 for Business Continuity Manager Software or
P9000 mainframe agent installed). Detailed pair state information for mainframe pairs in Device
Manager is equivalent to the information for open systems pairs shown in

Table 9

.

Legend:

--: Not applicable

Cnt Ac-S: Continuous Access Synchronous

Cnt Ac-A: Continuous Access Asynchronous

Cnt Ac-J: Continuous Access Journal

BC: Business Copy

1.

If HP StorageWorks P9000 for Business Continuity Manager Software 5.0 is being used, the
status of the primary volume is

SUSPCU

, and the status of the secondary volume is

SWAPPING

,

the copy pair status is displayed as

SUSPCU

in HP StorageWorks P9000 for Business Continuity

Manager Software and

Split (SW)

in Replication Manager.

2.

If HP StorageWorks P9000 for Business Continuity Manager Software 5.0 is being used, the
status of the primary volume is

SUSPER

, and the status of the secondary volume is

SWAPPING

,

the copy pair status is displayed as

SUSPER

in HP StorageWorks P9000 for Business Continuity

Manager Software and

Split (SW)

in Replication Manager.

3.

If HP StorageWorks P9000 for Business Continuity Manager Software 5.0 is being used, the
status of the primary volume is

DUPLEX

, and the status of the secondary volume is

SWAPPING

,

the copy pair status is displayed as

PENDING

in HP StorageWorks P9000 for Business Continuity

Manager Software and

Split (SW)

in Replication Manager.

4.

Suspending

,

Copying

or

Deleting (TRANS)

is the actual status, but in Replication Manager

this is abbreviated as

Suspending

or

Deleting (TRANS)

.

Changing copy pair status

Replication Manager allows you to change the copy pair status in open systems and mainframe
systems. Pair status change operations may be necessary to resume copy operations after recovery
from an error or unexpected pair status changes.

NOTE:

The Change Pair Status Wizard also supports site recovery operations for open systems. See

Advanced

pair operations and recovery scenarios

” on page 229 for more information.

Related topics

About copy pair status

, page 201

About changing copy pair status

, page 213

Change pair status workflow

, page 223

Advanced pair operations and recovery scenarios

, page 229

Managing pair life cycle

212

This manual is related to the following products: